Is there any way to configure Intel JBOD2224S2DP to power on automatically on AC power connection?

Currently after connecting JBOD to AC power I need to press front panel power button to turn it on. This mode is unacceptable. In case of AC power failure all equipment will be shut down and switched off by UPS. When AC power will be restored by UPS all servers and equipment are automatically turning on except this JBOD.

I have few another vendor JBOD's – LSI. They have hardware power switches on PSU and they are turning on immediately on AC power connection.

0 Kudos
1 Reply
idata
Employee
338 Views

Stanislav,

The JBOD2000 does not provide power on after AC fail. There is a plan to implement this feature, but it is not available at this time.

Regards,

John