Take a look at the following article on Symantec Connect which steps through Altiris Power Scheme Task, graceful shutdowns, and using Intel AMT for powering on clients in the environment.

 

http://bit.ly/cDhNzN    (note - this is the shortenend URL which will link to the Symantec Connect article)